Application
- Trapezoid concrete channel 9.5 x 2.5 m (w x h)
- Partially filled
- Very high volumes and velocities from time to time
Definition of tasks
- Detection and control of the volumes removed for irrigation purposes
- Transmission of measurement data to center via existing network (Ethernet)
- Highly dynamic measurement required (flow velocities from 0 – 200 cm/s)