United Kingdom
Application
- Pipe with 1.5m diameter, overflow on the side
- Partially filled
- Concrete construction
Definition of Task
- Stormwater overflow measurement in intake area of a WWTP according to EC self-monitoring regulation
- Detection of overflow volume, overflow time and duration according to German DWA directives