Hybrid Flow Measurement in Main Collector Channel Networks - Fix Installation Measurements Application Hood profile 2200 x 1980 Partially filled and full Precast concrete parts Sedimentation and temporary overflow Definition of tasks Detection of flow rates in a large main collector of a combined se
Dam Intake Measurement Flowing Waters - Power Plants Application Rectangular channel 1.80 x 3.00 m (h x w), partially concrete, partially dry-stone walls Partially filled Rainwater and surface water Short calming section Manual detection of flow rates (level reading and Q/h-table) destroyed after fl
Replacement of Measurement with inverted Syphon Channel Networks - Fix Installation Measurements Application Rectangular concrete channel, approx. 2.5 x 2.5 m (w x h) Partially filled Impoundage shield installed later in the channel with inverted syphon and EMF DN 800 Definition of tasks Detection o
Flow Rate Monitoring on Pumps Channel Networks - Pump Stations and Lifting Facilities Application Cast iron pipe DN 200 Full filled Old existing line (condition unknown), installed pipe system cannot be modified Definition of tasks Flow rate monitoring of feed pump to detect clogging and dry run Ten
Flow Measurement In Pipe That Could Not Be Shut Down Channel Networks - Fix Installation Measurements Application To supply high accuracy flow meter on a new works application, cost was an issue and maintaining a Mag meter was another issue. Definition of tasks The task was to find savings by not in
Flow Measurement Pumps Flow Measurement Pumps Application Pipe diameter 0.15 m, made of steel Full pipe Wet pumps Definition of tasks Determination of efficiency and alert when reaching the wear limit Quick and cost-efficient upgrade of a wastewater pump station with a flow measurement Measurement i
No Shutting Down the Flow Channel Networks - Fix Installation Measurements Application The need to replace the existing Time of Flight without shutting down the flow. 4m deep channel Application required to be installed in just 1 day Definition of tasks To be able to measure Flow without shutting do
Fix Installation Measurements Channel Networks
Hot Sludge Flow Measurement Wastewater Treatment Plant - Sludge Treatment Application Pipe with 0.15 m diameter, made of stainless steel Fully filled Medium contains oil and hot sludge High dry substance contents up to 30 g/l Definition of tasks Continuous measurement of sludge coming from a digesti
Return Sludge Flow Measurement Wastewater Treatment Plant - Sludge Treatment Application Pipe with 0.7 m diameter, made of stainless steel Fully filled Point of installation in telescopic pipe Definition of tasks Detection of sludge volumes to monitor and to control even sludge discharge from the se