Precipitation Measurement with GPRS Transmission Channel Networks - Fix Installation Measurements Application Determination of precipitation volumes for billing purposes within a water association consisting of several communities Setup of 7 precipitation measurement spots to detect stormwater volum
Flow Measurement in large Collector Duct Channel Networks - Fix Installation Measurements Application Trapezoid canal with dry weather flume and sloping bottom, 10 m x 2.5 m (w x h) Partially filled Old concrete Lateral inflow upstream of measurement place Definition of tasks Detection of combined s
Channel Dry Weather Flume Channel Networks - Fix Installation Measurements Application Segmented rectangular channel, 3 m width, made of concrete Partially filled Channel with dry weather flume and side space Definition of tasks Accurate detection of dry weather discharge and combined water discharg
Flow Measurement in Gold Ore Processing Plant Industry - Surface mining Application Stainless steel pipe DN 500 Partial filling with heavy fluctuation Acidified, very turbid water (approx. 50 NTU) Definition of tasks Replacement of a non-functioning clamp-on measurement Continuous flow measurement t
Flow Measurement Protected Area Drainage Flowing Waters - Flood Protection Application Steel pipeline DN 500 Fully filled Groundwater without any pollution Measurement system permanently immersed due to short calming section Definition of tasks Detection of drained volumes in the low-lying protectiv
Mine Water Flow Measurement Industry - Surface mining Application Rectangular concrete channel 2.5 x 1.5 m (w x h) Partially filled Pit water purification system of a brown coal surface mining plant Medium with high solid contents (iron ochre) Definition of tasks Continuous volume measurement for su
Contactless Flow Measurement on Fish Ladder Flowing Waters - Special Constructions Application Concrete intake channel 3.0 x 2.0 m (w x h) Partially filled Gravel bed Definition of tasks Flow measurement to ensure a minimum water volume required for the fish ladder No sensors can be installed on the
Flow Measurement on Flood Polder Flowing Waters - Flood Protection Application Concrete duct 6 x 3.5 m (w x h) Partially filled 3 parallel ducts Very high flow dynamics featuring flow rates up to 82 000 l/s Definition of tasks Detection of flood polder flow volumes of a large European river Control
Cooling Water Tap Industry - Chemical Industry Application Closed concrete rectangular channel, 3.8 x 3.5 m (h x w) Part filled Definition of tasks Pump control as well as the cooling process require to permanently control the flow within the cooling water channel The inflow must be controlled due t