Sludge Flow Measurement in Recirculation Line Wastewater Treatment Plant - Sludge Treatment Application Pipe with 0.4 m diameter, made of stainless steel Fully filled High pollution load, up to 1 % dry solids Definition of tasks Failsafe and stable measurement of the return sludge conveyed using scr
Flow Measurement Using Inverted ''Goose Neck'' Syphon Wastewater Treatment Plant - Discharge Area Application Pipe DN 150, made of stainless steel Fully filled EMF, faultily installed Definition of tasks Accurate measurement with high operational reliability required, which currently cannot be guara
Flow Measurement in Venturi Flume Wastewater Treatment Plant - Discharge Area Application Rectangular channel 0.5 x 0.6 m (w x h), made of concrete Partially filled Upgrading an existing Venturi flume with a measurement system Definition of tasks Detection of wastewater treatment plant discharge usi
Partial Discharge Section Flow Measurement Wastewater Treatment Plant - Discharge Area Application Pipe DN 500, made of stainless steel Fully filled Service water tapping and feeding point Definition of tasks For secondary clarification control a partial discharge of the WWTP needs to be measured Re
Flow Measurement in large WWTP Intake Area Wastewater Treatment Plant - Intake Area Application Structured U profie made of concrete, 2.5 x 2.5 m (w x h) with dry weather channel Partially filled Very high discharge dynamics Risk of sedimentation during nighttime Definition of tasks Detection of flo
Volume Measurement Overhead Tank Water Supply - Drinking Water Application Pipe with 0.25 m diameter, made of cast iron Fully filled Overhead tank featuring one single pipeline and flow in both directions Definition of tasks Comparison between water volumes consumed within the supply network during
Level Measurement Screening Debris Container Wastewater Treatment Plant - Intake Area Application Screenings container, 2.5 x 2.5 x 4.0 m (w x h x d) Medium: solid mixture Bulk cone with undefined angle Ex-Zone 1 Definition of tasks Level detection inscreenings container for overflow monitoring and
Contactless Flow Measurement Wastewater Treatment Plant - Intake Area Application Concrete channel, width 1.2 m Partially filled Measurement point upstream of screen and grit trap High sedimentation loads Definition of tasks Intake measurement as control measure to avoid WWTP flood Contactless measu
Open Channel Flow Measurement Wastewater Treatment Plant - Intake Area Application Rectangular channel made of concrete, width 1m Partially filled Strong fluctuation between daily and nightly inflow Definition of tasks Continuous flow rate measurement in a WWTP intake area Additional external level
Detection of Nighttime Volume Water Supply - Drinking Water Application Pipe with 0.1 m diameter Fully filled Low water volumes of approx. 3 l/s Definition of tasks Detection of problematic low quantities from a drinking water overhead tank during nighttimes Replaces the EMF not working properly due